We stayed put until the weekend – lots of work to get done, and we had a reasonable signal – but before we get moving.. it’s time for an oil and filter change on the engine.. Celeste..
Now that’s done.. let’s get moving..
Through Ellesmere tunnel and past Blake Mere lake..
And past the Lyneal trust who run a couple of boats specifically designed to cater for the disabled.. Wheelchair lifts on board.. rear desk designed so that someone deated can see to drive the boat. Awesome idea! 🙂
And I do wish someone would get settled.. And don’t drop the cushions into the canal this time!
We eventually got to Wixhall Moss junction – and there was a small stretch with armco to pull in at, so that’s the lot for today.